Bian Canal embankment repairs
The later Zizhi tongjian reports that Wang Jing and Wang Wu were dispatched to repair the Bian Canal embankments from Xingyang eastward to the sea outlet at Qiancheng.
Limits: Wikisource revision 2396387, juan 45. Line 107 distinguishes earlier breaches and an abandoned repair proposal from the fourth-month undertaking. The stated route describes the repair works, not an imperial journey.
- Read through an AI working translation.
Source: Zizhi tongjianRead the source